Digital Wireline Logs for Snapper A23A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Snapper A23A in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,220 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,220 m
- Datum Elevation
- 34.7 m
- Spud Date
- 30/03/1982
- Completion Date
- 09/05/1982
- Permit
- VIC L 10
- Rig
- -
Location
- Latitude
- -38.1938
- Longitude
- 148.0250