Skip to content

South East Longtom 1

Gippsland, Victoria

South East Longtom 1 is a petroleum well in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,735 m.

Request LAS Files & Well Summary

Well Information

Well Name
South East Longtom 1
Basin
Gippsland
State
Victoria
Classification
FDFE
Operator
Esso
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,735 m
Datum Elevation
21.5 m
Spud Date
06/11/2010
Completion Date
09/12/2010
Permit
Vic / L09

Location

Latitude
-38.1204
Longitude
148.3860

Available Log Data

7
Log Streams
144
Curves
1,455,748
Data Points
271,655
Metres

Other (14 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
EHD1_PPC2 901 m 2733 m 1832 m
EHD2_PPC2 901 m 2733 m 1832 m
GR_RAB_RT 930 m 2627 m 1697 m
RES_BD_RT 945 m 2628 m 1682 m
RES_BIT_RT 941 m 2628 m 1686 m
RES_BM_RT 940 m 2628 m 1687 m
RES_BS_RT 939 m 2628 m 1688 m
RES_RING_RT 940 m 2628 m 1687 m
T2_DIST_MW[0] 918 m 2731 m 1812 m
T2_DIST_MW[0] 937 m 2722 m 1785 m
TAB_RAB_BM 939 m 2727 m 1787 m
TAB_RAB_BS 939 m 2727 m 1787 m
TICK_RAB_BIT 2628 m 2732 m 104 m
TICK_RAB_RING 2628 m 2726 m 97 m

Borehole Geometry (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
HAZI 900 m 2733 m 1833 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
EHD1_PPC1 901 m 2733 m 1832 m
EHD2_PPC1 901 m 2733 m 1832 m
HCAL 918 m 2731 m 1812 m
HCAL 918 m 2731 m 1812 m

Chromato (16 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CO2 82 m 2735 m 2653 m
ETHA 82 m 2735 m 2653 m
ETHX 82 m 2735 m 2653 m
FLIN 82 m 2735 m 2653 m
H2S 82 m 2735 m 2653 m
IBUT 82 m 2735 m 2653 m
IBUX 82 m 2735 m 2653 m
IPEN 82 m 2735 m 2653 m
IPEX 82 m 2735 m 2653 m
METH 82 m 2735 m 2653 m
METX 82 m 2735 m 2653 m
NBUT 82 m 2735 m 2653 m
NBUX 82 m 2735 m 2653 m
NPEN 82 m 2735 m 2653 m
NPEX 82 m 2735 m 2653 m
PROP 82 m 2735 m 2653 m

CMR (16 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CFF2 918 m 2731 m 1812 m
CFF2 937 m 2722 m 1785 m
CMFF 918 m 2731 m 1812 m
CMFF 937 m 2722 m 1785 m
CMRP_3MS 918 m 2731 m 1812 m
CMRP_3MS 937 m 2722 m 1785 m
KSDR 918 m 2731 m 1812 m
KSDR 938 m 2715 m 1777 m
KTIM 918 m 2731 m 1812 m
KTIM 918 m 2731 m 1812 m
T2CUTOFF 918 m 2731 m 1812 m
T2CUTOFF 937 m 2722 m 1785 m
T2LM 918 m 2731 m 1812 m
T2LM 937 m 2722 m 1785 m
TCMR 918 m 2731 m 1812 m
TCMR 937 m 2722 m 1785 m

Density (8 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DSOZ 918 m 2729 m 1811 m
DSOZ 938 m 2715 m 1777 m
HDRA 918 m 2729 m 1811 m
HDRA 938 m 2727 m 1789 m
PEFZ 918 m 2729 m 1811 m
PEFZ 938 m 2715 m 1777 m
RHOZ 918 m 2729 m 1811 m
RHOZ 938 m 2727 m 1789 m

GR (24 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR_ARC 927 m 2722 m 1795 m
GR_EDTC 871 m 2705 m 1834 m
GR_EDTC 918 m 2731 m 1812 m
GR_EDTC 938 m 2715 m 1777 m
GR_EDTC 198 m 2706 m 2508 m
GR_RAB 927 m 2727 m 1800 m
GRD 82 m 2735 m 2653 m
HCGR 918 m 2731 m 1812 m
HCGR 938 m 2715 m 1777 m
HFK 918 m 2731 m 1812 m
HFK 938 m 2715 m 1777 m
HSGR 918 m 2731 m 1812 m
HSGR 938 m 2715 m 1777 m
HTHO 918 m 2731 m 1812 m
HTHO 938 m 2715 m 1777 m
HTPR 918 m 2731 m 1812 m
HTPR 938 m 2715 m 1777 m
HTUR 918 m 2731 m 1812 m
HTUR 938 m 2715 m 1777 m
HUPR 918 m 2731 m 1812 m
HUPR 938 m 2715 m 1777 m
HURA 918 m 2731 m 1812 m
HURA 938 m 2715 m 1777 m
TICK_ARC_GR 929 m 2722 m 1792 m

Logging Parameters (5 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CDF 918 m 2731 m 1812 m
CDF 937 m 2722 m 1785 m
TENS 870 m 2735 m 1865 m
TENS 918 m 2731 m 1812 m
TENS 918 m 2731 m 1812 m

Miscellaneous (9 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BS 918 m 2731 m 1812 m
BS 937 m 2722 m 1785 m
DEPT 82 m 2735 m 2653 m
DEPT 870 m 2735 m 1865 m
DEPT 927 m 2736 m 1809 m
DEPT 82 m 2735 m 2653 m
DEPT 918 m 2731 m 1812 m
DEPT 918 m 2731 m 1812 m
DEPT 198 m 2727 m 2529 m

Mudlog (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
APRS_ARC 927 m 2723 m 1796 m
ATMP 927 m 2723 m 1796 m
ECD_ARC 927 m 2723 m 1796 m
ROP 82 m 2735 m 2653 m
ROP5_RM 939 m 2736 m 1797 m
RPM 82 m 2735 m 2653 m
SPP 82 m 2735 m 2653 m
TGAS 82 m 2735 m 2653 m
TGAX 82 m 2735 m 2653 m
TORQ 82 m 2735 m 2653 m
WOB 82 m 2735 m 2653 m

Neutron (2 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
TNPH 918 m 2731 m 1812 m
TNPH 946 m 2731 m 1784 m

Resistivity (29 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
A16H 939 m 2723 m 1783 m
A22H 939 m 2723 m 1783 m
A28H 939 m 2723 m 1783 m
A34H 939 m 2723 m 1783 m
A40H 939 m 2723 m 1783 m
P16H 939 m 2723 m 1783 m
P22H 939 m 2723 m 1783 m
P28H 939 m 2723 m 1783 m
P34H 939 m 2723 m 1783 m
P40H 939 m 2723 m 1783 m
PROX 82 m 2735 m 2653 m
RES_BD 2628 m 2727 m 98 m
RES_BIT 2628 m 2732 m 104 m
RES_BM 2628 m 2727 m 98 m
RES_BS 2628 m 2727 m 98 m
RES_RING 2628 m 2727 m 99 m
RLA1 938 m 2711 m 1773 m
RLA2 938 m 2711 m 1773 m
RLA3 938 m 2711 m 1773 m
RLA4 938 m 2711 m 1773 m
RLA5 938 m 2711 m 1773 m
RSOZ 918 m 2731 m 1812 m
RSOZ 938 m 2727 m 1789 m
RT_HRLT 938 m 2711 m 1773 m
TAB_RAB_BD 939 m 2727 m 1787 m
TAB_RAB_BIT 939 m 2732 m 1793 m
TAB_RAB_GR 927 m 2727 m 1800 m
TAB_RAB_RING 927 m 2727 m 1799 m
TICK_ARC_RES 930 m 2722 m 1791 m

Sonic (4 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DTCO 198 m 2727 m 2529 m
DTSM 941 m 2722 m 1780 m
PR 941 m 2722 m 1780 m
VPVS 941 m 2722 m 1780 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 938 m 2711 m 1773 m