Digital Wireline Logs for Tuna A9A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tuna A9A in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,793 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,793 m
- Datum Elevation
- 38.9 m
- Spud Date
- 01/07/1998
- Completion Date
- 18/07/1998
- Permit
- VIC L 9
- Rig
- -
Location
- Latitude
- -38.1697
- Longitude
- 148.4190