Hoover 2
Hoover 2 is a petroleum well in the Carnarvon, Western Australia, operated by Apache, drilled to a total depth of 3,604 m.
Well Information
Drilling Data
- Total Depth
- 3,604 m
- Datum Elevation
- 31.9 m
- Spud Date
- 11/08/2003
- Completion Date
- 28/08/2003
- Permit
- WA TL 6
- Rig
- Ensco 56
Location
- Latitude
- -20.7395
- Longitude
- 115.5720
Available Log Data
Borehole Geometry (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| AZT | 730 m | 3603 m | 2873 m |
| TVD | 730 m | 3603 m | 2873 m |
Chromato (8 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| ETHA | 758 m | 3604 m | 2846 m |
| IBUT | 758 m | 3604 m | 2846 m |
| MDOU | 71 m | 3603 m | 3532 m |
| METH | 758 m | 3604 m | 2846 m |
| MTIN | 71 m | 3603 m | 3532 m |
| MTOU | 71 m | 3604 m | 3533 m |
| NBUT | 758 m | 3604 m | 2846 m |
| PROP | 758 m | 3604 m | 2846 m |
GR (1 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GRAM | 719 m | 3595 m | 2875 m |
Miscellaneous (5 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 719 m | 3603 m | 2883 m |
| DEPTH | 71 m | 3604 m | 3533 m |
| INC | 730 m | 3603 m | 2873 m |
| MFIN | 71 m | 3603 m | 3532 m |
| MFOU | 71 m | 3603 m | 3532 m |
Mudlog (11 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| HKLD | 71 m | 3603 m | 3532 m |
| MDIN | 71 m | 3603 m | 3532 m |
| ROP | 71 m | 3603 m | 3532 m |
| ROPS | 756 m | 3603 m | 2846 m |
| RPMM | 71 m | 756 m | 685 m |
| RPMS | 71 m | 3603 m | 3532 m |
| RPMT | 71 m | 3603 m | 3532 m |
| SPP | 71 m | 3603 m | 3532 m |
| TGAS | 71 m | 3604 m | 3533 m |
| TORQ | 71 m | 3603 m | 3532 m |
| WOB | 71 m | 3603 m | 3532 m |
Resistivity (7 curves)
Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| RACHM | 760 m | 3594 m | 2834 m |
| RACLM | 760 m | 3594 m | 2834 m |
| RPCHM | 760 m | 3594 m | 2834 m |
| RPCLM | 760 m | 3594 m | 2834 m |
| RPIHM | 720 m | 3595 m | 2874 m |
| RPTHM | 720 m | 3595 m | 2874 m |
| TCDM | 723 m | 3589 m | 2866 m |