Skip to content

Marley 1

Carnarvon, Western Australia

Marley 1 is a petroleum well in the Carnarvon, Western Australia, operated by Apache, drilled to a total depth of 3,115 m.

Request LAS Files & Well Summary

Well Information

Well Name
Marley 1
Basin
Carnarvon
State
Western Australia
Classification
NEST
Operator
Apache
Driller
Ensco
Data Summary
Partial WDS Available

Drilling Data

Total Depth
3,115 m
Datum Elevation
33.4 m
Spud Date
09/12/2005
Completion Date
23/01/2006
Permit
WA TL 5
Rig
Rig 106

Location

Latitude
-20.4246
Longitude
115.6900

Available Log Data

5
Log Streams
65
Curves
430,571
Data Points
97,804
Metres

Other (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
INDEX 2497 m 3030 m 533 m

Borehole Geometry (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEVI 2498 m 3030 m 532 m
HAZI 2498 m 3030 m 532 m

Caliper (3 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
C14 2498 m 3030 m 532 m
C25 2498 m 3030 m 532 m
C36 2498 m 3030 m 532 m

Chromato (10 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 962 m 3115 m 2153 m
IBUT 962 m 3115 m 2153 m
IPEN 962 m 3115 m 2153 m
MDOU 760 m 3115 m 2355 m
METH 962 m 3115 m 2153 m
MTIN 760 m 3115 m 2355 m
MTOU 760 m 3115 m 2355 m
NBUT 962 m 3115 m 2153 m
NPEN 962 m 3115 m 2153 m
PROP 962 m 3115 m 2153 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 2394 m 3034 m 639 m
PEF 2394 m 3034 m 639 m
RHOB 2394 m 3034 m 639 m

GR (11 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GKUT 2498 m 3021 m 522 m
GR 2340 m 3024 m 684 m
GR 2498 m 3014 m 515 m
GR 2498 m 3013 m 515 m
GRAFM 925 m 3061 m 2136 m
GRAX 3061 m 3110 m 49 m
GRK 2498 m 3021 m 522 m
GRKT 2498 m 3014 m 515 m
GRTH 2498 m 3021 m 522 m
GRTO 2498 m 3021 m 522 m
GRUR 2498 m 3021 m 522 m

Logging Parameters (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
TENS 2314 m 3061 m 746 m

Miscellaneous (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITD 760 m 3115 m 2355 m
DEPTH 925 m 3116 m 2191 m
DEPTH 760 m 3115 m 2355 m
DEPTH 2314 m 3061 m 746 m
DEPTH 962 m 3115 m 2153 m
MFIN 760 m 3115 m 2355 m

Mudlog (13 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
BITT 760 m 3115 m 2355 m
DXC 760 m 3115 m 2355 m
MDIN 760 m 3115 m 2355 m
PITV 760 m 3115 m 2355 m
ROP 760 m 3115 m 2355 m
ROPA 926 m 3115 m 2189 m
ROTT 760 m 3115 m 2355 m
RPMS 760 m 3115 m 2355 m
SPP 760 m 3115 m 2355 m
TGAS 962 m 3115 m 2153 m
TORQ 760 m 3115 m 2355 m
TREV 760 m 3115 m 2355 m
WOB 760 m 3115 m 2355 m

Neutron (1 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
NPHI 2394 m 3029 m 634 m

Resistivity (12 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 2394 m 3060 m 665 m
LLS 2394 m 3060 m 665 m
RPCEHM 951 m 3061 m 2110 m
RPCEHM 3060 m 3110 m 50 m
RPCELM 951 m 3061 m 2110 m
RPCESHM 951 m 3061 m 2110 m
RPCESHM 3060 m 3110 m 50 m
RPCESLM 951 m 3061 m 2110 m
RPIHM 925 m 3060 m 2135 m
RPTHM 925 m 3060 m 2135 m
TCDM 926 m 3064 m 2138 m
TCDX 927 m 3114 m 2186 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 2394 m 3045 m 650 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 2394 m 3020 m 625 m