Skip to content

East Heaton 1

Perth, Western Australia

East Heaton 1 is a petroleum well in the Perth, Western Australia, operated by WMC, drilled to a total depth of 2,520 m.

Request LAS Files & Well Summary

Well Information

Well Name
East Heaton 1
Basin
Perth
State
Western Australia
Classification
NEST
Operator
WMC
Driller
Westbridge
Data Summary
Partial WDS Available

Drilling Data

Total Depth
2,520 m
Datum Elevation
258.8 m
Spud Date
04/01/1985
Completion Date
24/01/1985
Permit
EP 23 (R2)

Location

Latitude
-29.1144
Longitude
115.2496

Available Log Data

2
Log Streams
15
Curves
168,680
Data Points
25,707
Metres

Caliper (1 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 75 m 2521 m 2445 m

Chromato (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 2032 m 2519 m 486 m
METH 1879 m 2519 m 640 m
NBUT 2029 m 2519 m 489 m
PROP 2031 m 2519 m 487 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 6 m 2498 m 2492 m

Miscellaneous (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPT 6 m 2521 m 2514 m
DEPT 29 m 2519 m 2490 m

Mudlog (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 29 m 2519 m 2490 m
TGAS 2012 m 2519 m 507 m

Resistivity (3 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
ILD 79 m 2517 m 2438 m
ILM 78 m 2517 m 2439 m
MSFL 114 m 1019 m 905 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT 75 m 2511 m 2435 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 75 m 2517 m 2441 m