Digital Wireline Logs for Huckleberry 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Huckleberry 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,343 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,343 m
- Datum Elevation
- 177.0 m
- Spud Date
- 23/04/2006
- Completion Date
- 04/05/2006
- Permit
- ATP 299P
- Rig
- Rig 735
Location
- Latitude
- -28.8924
- Longitude
- 143.3770