Digital Wireline Logs for Kaimiro 10
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Kaimiro 10 in the Taranaki, New Zealand, operated by Petrocorp, drilled to a total depth of 1,557 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,557 m
- Datum Elevation
- 275.0 m
- Spud Date
- 08/08/1995
- Completion Date
- 21/08/1995
- Permit
- PML-38091
- Rig
- Rig 2
Location
- Latitude
- -39.1764
- Longitude
- 174.1530