Digital Wireline Logs for Oak Park 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Oak Park 1 in the Bowen, Queensland, operated by OCA, drilled to a total depth of 303 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 303 m
- Datum Elevation
- -
- Spud Date
- 12/12/2000
- Completion Date
- 21/12/2000
- Permit
- EPP 564
- Rig
- -
Location
- Latitude
- -23.0244
- Longitude
- 148.6160