Digital Wireline Logs for Tilbrook 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tilbrook 5 in the Bowen, Queensland, operated by Sunshine, drilled to a total depth of 345 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 345 m
- Datum Elevation
- 286.8 m
- Spud Date
- 18/11/2004
- Completion Date
- 28/11/2004
- Permit
- ATP 688 P
- Rig
- Rig 6, 7
Location
- Latitude
- -21.0316
- Longitude
- 147.8150