Digital Wireline Logs for Zerogen 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Zerogen 1 in the Bowen, Queensland, operated by Upstream, drilled to a total depth of 1,491 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,491 M
- Datum Elevation
- 186.2 m
- Spud Date
- 10/06/2006
- Completion Date
- 09/07/2006
- Permit
- ATP 722 P
- Rig
- Rig 3
Location
- Latitude
- -24.0249
- Longitude
- 148.5050