Chilla 2
Chilla 2 is a petroleum well in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,818 m.
Well Information
Drilling Data
- Total Depth
- 1,818 m
- Datum Elevation
- 109.7 m
- Spud Date
- 26/08/2007
- Completion Date
- 04/09/2007
- Permit
- PL 25
- Rig
- Rig 721
Location
- Latitude
- -27.5142
- Longitude
- 142.1380