Digital Wireline Logs for Chilla 3A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Chilla 3A in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,528 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,528 m
- Datum Elevation
- -
- Spud Date
- 15/01/2009
- Completion Date
- 28/01/2009
- Permit
- PL 23
- Rig
- Rig 721
Location
- Latitude
- -27.5084
- Longitude
- 142.1300