Digital Wireline Logs for Gimboola 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Gimboola 2 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,393 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,393 m
- Datum Elevation
- 174.5 m
- Spud Date
- 21/05/2006
- Completion Date
- 25/05/2006
- Permit
- PL 169
- Rig
- Rig 735
Location
- Latitude
- -26.8801
- Longitude
- 142.4180