Digital Wireline Logs for Muchacho 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Muchacho 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,460 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,460 m
- Datum Elevation
- 85.6 m
- Spud Date
- 28/07/2007
- Completion Date
- 07/08/2007
- Permit
- PL 25
- Rig
- Rig 721
Location
- Latitude
- -27.4841
- Longitude
- 142.1170