Digital Wireline Logs for Tequila 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tequila 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,588 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,588 m
- Datum Elevation
- 156.6 m
- Spud Date
- 22/02/2007
- Completion Date
- 05/03/2007
- Permit
- PL 23
- Rig
- Rig 724
Location
- Latitude
- -27.5525
- Longitude
- 142.3720