Digital Wireline Logs for Bugito 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bugito 2 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,319 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,319 m
- Datum Elevation
- 33.0 m
- Spud Date
- 03/10/2007
- Completion Date
- 04/10/2007
- Permit
- PPL 36
- Rig
- Rig 709
Location
- Latitude
- -28.5505
- Longitude
- 140.2940