Digital Wireline Logs for Charo 6
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Charo 6 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,871 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,871 m
- Datum Elevation
- 28.8 m
- Spud Date
- 19/08/2009
- Completion Date
- 29/08/2009
- Permit
- PPL 177
- Rig
- -
Location
- Latitude
- -27.4377
- Longitude
- 139.7210