Digital Wireline Logs for Curlington 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Curlington 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,977 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,977 m
- Datum Elevation
- 52.0 m
- Spud Date
- 04/12/2007
- Completion Date
- 12/12/2007
- Permit
- PEL 114
- Rig
- Rig 709
Location
- Latitude
- -28.6095
- Longitude
- 140.3030