Digital Wireline Logs for Hobbes 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hobbes 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,546 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,546 m
- Datum Elevation
- -
- Spud Date
- 11/04/2008
- Completion Date
- 19/04/2008
- Permit
- PPL 188
- Rig
- Rig 721
Location
- Latitude
- -28.4615
- Longitude
- 140.4720