Digital Wireline Logs for Seccante 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Seccante 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,325 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,325 m
- Datum Elevation
- 33.5 m
- Spud Date
- 16/09/2007
- Completion Date
- 23/09/2007
- Permit
- PPL 36
- Rig
- Rig 709
Location
- Latitude
- -28.5322
- Longitude
- 140.2870