Skip to content

Digital Wireline Logs for Tonno 1

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Eromanga, South Australia

Quality-controlled, spliced, and depth-matched wireline log data for Tonno 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,569 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Tonno 1
Basin
Eromanga
State
South Australia
Classification
NEST
Operator
Santos
Driller
PDI

Drilling Data

Total Depth
1,569 m
Datum Elevation
49.7 m
Spud Date
27/06/2007
Completion Date
10/07/2007
Permit
PPL 188
Rig
Rig 724

Location

Latitude
-28.4666
Longitude
140.5100