Digital Wireline Logs for Tumby 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tumby 1 in the Eromanga, South Australia, operated by Beach, drilled to a total depth of 1,845 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,845 m
- Datum Elevation
- -
- Spud Date
- 02/05/09
- Completion Date
- 10/05/09
- Permit
- PEL 92
- Rig
- Rig 30
Location
- Latitude
- -27.9119
- Longitude
- 139.2960