Digital Wireline Logs for Wheels 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Wheels 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,900 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,900 m
- Datum Elevation
- 86.8 m
- Spud Date
- 12/05/2007
- Completion Date
- 26/05/2007
- Permit
- PPL 12
- Rig
- Rig 724
Location
- Latitude
- -28.1317
- Longitude
- 140.9210