Digital Wireline Logs for Bluff 1 - Bow
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bluff 1 - Bow in the Bowen, Queensland, operated by MIM, drilled to a total depth of 846 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 846 M
- Datum Elevation
- -
- Spud Date
- 19/06/1992
- Completion Date
- 17/07/1992
- Permit
- EPP 447
- Rig
- -999.25
Location
- Latitude
- -23.5000
- Longitude
- 149.1470