Digital Wireline Logs for Mira 1 - Bow
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mira 1 - Bow in the Bowen, Queensland, operated by Santos, drilled to a total depth of 252 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 252 m
- Datum Elevation
- 216.7 m
- Spud Date
- 24/11/05
- Completion Date
- 29/11/05
- Permit
- ATP 337 P
- Rig
- Rig 120
Location
- Latitude
- -24.1614
- Longitude
- 148.7530