Digital Wireline Logs for Shotover 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Shotover 1 in the Bowen, Queensland, operated by Houston, drilled to a total depth of 2,716 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,716 M
- Datum Elevation
- 460.4 m
- Spud Date
- 13/05/1975
- Completion Date
- 11/07/1975
- Permit
- EPP 231
- Rig
- -999.25
Location
- Latitude
- -23.9600
- Longitude
- 149.1380