Timmy 1
Timmy 1 is a petroleum well in the Surat, Queensland, operated by OCA, drilled to a total depth of 701 M.
Well Information
Drilling Data
- Total Depth
- 701 M
- Datum Elevation
- 154.3 m
- Spud Date
- 19/10/2002
- Completion Date
- 31/10/2002
- Permit
- EPP 602
- Rig
- Rig 101
Location
- Latitude
- -25.0681
- Longitude
- 150.0650
Available Log Data
Caliper (2 curves)
Borehole diameter measurements indicating hole condition and washout zones.
| Curve | Start | End | Interval |
|---|---|---|---|
| CALI | 0 m | 699 m | 699 m |
| CALI | 0 m | 699 m | 699 m |
Density (4 curves)
Bulk density measurements for porosity calculation and lithology identification.
| Curve | Start | End | Interval |
|---|---|---|---|
| LSD | 0 m | 699 m | 698 m |
| LSD | 0 m | 699 m | 698 m |
| SSD | 1 m | 699 m | 698 m |
| SSD | 1 m | 699 m | 698 m |
GR (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| GR | 0 m | 698 m | 698 m |
| GR | 0 m | 698 m | 698 m |
Miscellaneous (2 curves)
Well log curves recorded during wireline logging operations.
| Curve | Start | End | Interval |
|---|---|---|---|
| DEPTH | 0 m | 699 m | 699 m |
| DEPTH | 0 m | 699 m | 699 m |
Neutron (2 curves)
Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.
| Curve | Start | End | Interval |
|---|---|---|---|
| NPOR | 0 m | 699 m | 699 m |
| NPOR | 0 m | 699 m | 699 m |